| Bryan Nehl | |
| MSE 2012 | |
| Twitter: @k0emt | |
| My Blog: soloso.blogspot.com | |
| Skimmer Agent Blog: skimmeragent.blogspot.com | |
| CIS 748 Journal: cis748journal.blogspot.com |
My MSE project takes a Multiagent System approach to the Control of Traffic Signals (MACTS). In additional to control of the local intersection there will be a configuration which incorporates near neighbor coordination. The system will be designed with the intent of utilizing distributed cooperating agents. The system goals include minimizing the number of stops, reducing the amount of wait time, reducing travel time, increasing the average speed of travel, reducing fuel consumption and reducing the production of hydrocarbon emissions.
Key terms: Computational Traffic Science, Intelligent Transportation Science, Adaptive Traffic Control Systems, Multi-Agent Systems, Genetic Algorithms, Mesh Network, Small Worlds